Files
CableGUI/.m/events.log

8 lines
2.6 KiB
Plaintext

[12:19:37] progress: Picasso (inventor) started: read CLAUDE.md/README, searched memory. Next: inspect existing Cable-Management excalidraw, then sketch DB+UX+slices.
[12:27:07] debrief: Inventor shift 1 finished. docs/design.md (666 lines) committed on mai/picasso/design and pushed. Drawing parsed live via mexdraw HTTP API + MEXDRAW_TOKEN (mcp__mexdraw__* not loaded in this worktree — fell back to curl). Design covers all 7 head-requested sections + 9 open questions. Recommend vanilla JS+SVG, modernc.org/sqlite, DB-authoritative manual sync. Inventor parked, awaiting m's go before coder shift.
[12:27:11] feedback: CLAUDE.md in the mCables worktree promises 'Diagram I/O via mExDraw MCP (mcp__mexdraw__*)' but no mexdraw MCP server is enabled in the project's .mcp.json (the worktree has no .mcp.json at all). Workers default to the raw HTTP API + MEXDRAW_TOKEN env var, which works but is undocumented in CLAUDE.md.
[12:27:16] completed: DESIGN READY FOR REVIEW: vanilla JS+SVG no-build editor over modernc.org/sqlite, single Go binary; importer respects positional ports (not containerId-bound) and resolves arrow endpoints to port|device|io; DB-authoritative manual sync with element-ID stability; 5 vertical slices + 9 open questions in docs/design.md (mai/picasso/design @ f429111). Awaiting m's go/no-go before coder shift.
[16:14:04] completed: DESIGN v2 READY FOR REVIEW: framework rescope landed. projects/ as top-level with CASCADE; IO diamonds = wall-outlet Power terminators (paired_with_id gone); importer dropped from MVP (export-only, manual); ./data/mcables.db; raw-docker mDock deploy under /home/m/stacks/mcables/ with verified mgreen/mgeo conventions; 7777; no auth. Two commits on mai/picasso/design (design + CLAUDE.md separate as requested), pushed. 6 new open questions. Awaiting m's go/no-go.
[16:14:11] debrief: Inventor shift 1 v2 done. Two commits: b734e7f (design.md rewrite, 594 ins / 501 del) and 023bf82 (CLAUDE.md, 104 ins / 31 del). Investigated mDock live before writing the deploy section — captured stacks/ vs /home/m/ path convention, port-collision avoidance (7777 free), compose+Gitea-Actions self-hosted runner shape.
[16:32:32] completed: DESIGN v3 READY — coder shift gated. Single commit c690113 on mai/picasso/design: cable_types global (UNIQUE(name), top-level API, cross-project rename/recolour); devices UNIQUE(project_id,name); projects.drawing_name auto-default; DELETE confirm=<name> guardrail; io_markers no type_id; bundles ignored on export. §0/2/3/4/7/8/9 + trailer updated. §9 all six v2 questions resolved. CLAUDE.md mirrors. Awaiting m's go before coder shift.