• Joined on 2026-01-29
mAi opened issue m/mDMS#3 2026-05-16 16:17:06 +00:00
paperless-AI prompt: never use 'Matthias Siebels' as correspondent + allow new correspondents for genuinely new senders + reconcile prompt drift
mAi commented on issue m/mDMS#2 2026-05-16 15:58:07 +00:00
mover: strip blank pages (duplex scans leave empty backside per patch-T separator)

Done. Mover now strips blank pages before promoting to toprocess. Migrated infra/mdms-mover/ from m/otto (otto#438 → mDMS#2) and added strip_blank_pages.py.

Commit: https://mgit.msbls.de/…

mAi opened issue m/mDMS#2 2026-05-16 15:46:23 +00:00
mover: strip blank pages (duplex scans leave empty backside per patch-T separator)
mAi commented on issue m/mDMS#1 2026-05-16 13:53:36 +00:00
Scan-Stack: Multi-Page-Scan in separate Dokumente teilen (Barcode- oder Blank-Page-Separator)

Erledigt — Option A (Paperless built-in Patch-T-Splitter)

Was live ist (mDock)

~/paperless/docker-compose.yml, webserver-Service:

PAPERLESS_CONSUMER_ENABLE_BARCODES: "true"
PAPE…
mAi commented on issue m/projax#1 2026-05-16 13:22:35 +00:00
Sub-Project Support: Health → Mental (Alias: Psychologie) und das generelle Sub-Projekt-Modell

This issue is obsolete — schema already exists

m corrected me on 2026-05-16: projax has been actively developed and the schema features I framed as "needed" are already in place:

-…

mAi opened issue m/projax#3 2026-05-16 13:22:18 +00:00
projax-mcp: register as Claude MCP server for project management + task admin
mAi commented on issue m/projax#1 2026-05-16 13:19:53 +00:00
Sub-Project Support: Health → Mental (Alias: Psychologie) und das generelle Sub-Projekt-Modell

Third sub-project use-case — NewHomeSpecs under mHome

Added 2026-05-16 (PWA chat): m wants a sub-project NewHomeSpecs under mHome for collecting specifications for his next home. Same…

mAi opened issue m/projax#2 2026-05-15 17:15:46 +00:00
PWA-Ausprägung nachrüsten: Bottom-Bar + Standard-Layout für projax
mAi opened issue m/projax#1 2026-05-15 17:02:04 +00:00
Sub-Project Support: Health → Mental (Alias: Psychologie) und das generelle Sub-Projekt-Modell
mAi opened issue m/mDMS#1 2026-05-15 17:01:23 +00:00
Scan-Stack: Multi-Page-Scan in separate Dokumente teilen (Barcode- oder Blank-Page-Separator)
mAi commented on issue m/mGPUmanager#1 2026-05-15 14:57:18 +00:00
Phase 1: GPU-Manager — Schritte 0–5 (ComfyUI systemd → mVoice load/unload → Broker MVP → wa.sh migrate → Queue → LRU-Eviction)

Phase 1 acceptance — live on mRock, wa.sh now on main

Knuth verified all five live-validation steps (see #issuecomment-7984

mAi commented on issue m/mGPUmanager#1 2026-05-15 14:55:27 +00:00
Phase 1: GPU-Manager — Schritte 0–5 (ComfyUI systemd → mVoice load/unload → Broker MVP → wa.sh migrate → Queue → LRU-Eviction)

Shift 2 — Live mRock deploy verified (Schritte 0–5 acceptance evidence)

All five live-validation steps from atlas's instruction pass. WA roundtrip + 24 h soak (step 6) gated on m driving a…

mAi commented on issue m/mGPUmanager#1 2026-05-15 14:45:22 +00:00
Phase 1: GPU-Manager — Schritte 0–5 (ComfyUI systemd → mVoice load/unload → Broker MVP → wa.sh migrate → Queue → LRU-Eviction)

Phase 1 merged to main

  • m/mGPUmanager: cacba89Merge Phase 1 — Schritte 0–5 (broker MVP, queue, LRU eviction)
  • m/mVoice:…
mAi commented on issue m/paliad#38 2026-05-15 01:05:06 +00:00
aichat Phase B — paliad migration to centralized chat backend (PALIADIN_BACKEND=aichat opt-in)

Phase B shipped + merged to main.

3 atomic commits on mai/planck/aichat-phase-b-paliad:

  1. 08e2088 — revive per-turn JWT mint (folded-in from…
mAi opened issue m/paliad#38 2026-05-15 00:52:19 +00:00
aichat Phase B — paliad migration to centralized chat backend (PALIADIN_BACKEND=aichat opt-in)
mAi commented on issue m/paliad#35 2026-05-14 22:10:53 +00:00
Project Timeline / Chart — inventor design pass (broader visualisation, vertical/horizontal, single/multi-column, colors, export)

Slice 4 (FINAL) shipped. Two atomic commits:

  1. 83a3d27 — ShapeTimeline enum + render_spec wiring (backend). 9-case TestRenderSpec_TimelineConfigV…
mAi commented on issue m/paliad#35 2026-05-14 22:10:38 +00:00
Project Timeline / Chart — inventor design pass (broader visualisation, vertical/horizontal, single/multi-column, colors, export)

Slice 4 (FINAL) shipped — coder pass (tesla)

Branch: mai/tesla/project-timeline-chart (pushed, 2 commits ahead of main)

This is the last slice of the 4-slice roadmap. The original…

mAi commented on issue m/onepager#14 2026-05-14 22:05:08 +00:00
Move ~/dev/onepager → ~/dev/web/onepager (Pfad-Alignment, nach #13)

Done — physischer Move ist durch.

  • mv /home/m/dev/onepager /home/m/dev/web/onepager ausgeführt (Inode-level, kein clone)
  • mai.projects.onepager.path updated auf ~/dev/web/onepager -…
mAi commented on issue m/paliad#35 2026-05-13 09:54:36 +00:00
Project Timeline / Chart — inventor design pass (broader visualisation, vertical/horizontal, single/multi-column, colors, export)

Slice 3 shipped to main. Five atomic commits:

  1. 581fbe7 — range chips (default 1y, +2y / all / custom) + URL state (faraday-Q8).
  2. [731e762](htt…
mAi commented on issue m/paliad#35 2026-05-13 09:54:30 +00:00
Project Timeline / Chart — inventor design pass (broader visualisation, vertical/horizontal, single/multi-column, colors, export)

Slice 3 shipped — coder pass (tesla)

Branch: mai/tesla/project-timeline-chart (pushed, 5 commits ahead of main)

Commits

  • 581fbe7 range chips + custom-range…