docs(test-strategy): fold m's §10 decisions addendum
m's 2026-05-19 picks via AskUserQuestion interview: - Q1 budget: 60–90s gate, 3–4min full (inventor's call — m deferred) - Q2 CI: Gitea Actions, gate tier only - Q3 test DB: YouPC for devs + ephemeral docker for CI - Q4 coverage: critical-path only, no % gate - Q5 floor: Slices 1+4+5 before new feature work - Q6 ownership: head decides + rotate per profile All six matched inventor's recommendation. Slice 1 (migration dry-run + boot smoke) starts first; Slices 4+5 in parallel after.
This commit is contained in:
@@ -555,3 +555,28 @@ If m's calls match inventor's, the implementer's brief writes itself: Slice 1 fi
|
||||
---
|
||||
|
||||
**Status:** DESIGN READY FOR REVIEW. Awaiting m go/no-go on §5 slice plan + §6 open questions before any coder shift starts.
|
||||
|
||||
---
|
||||
|
||||
## 10. m's decisions (2026-05-19, locked)
|
||||
|
||||
Walked through §6 with m via the AskUserQuestion interview (per head's 2026-05-19 workflow rule: inventor questions are resolved before parking, not after). Six picks locked, all matching inventor's recommendation.
|
||||
|
||||
| # | Question | m's answer | Effect on plan |
|
||||
|---|---|---|---|
|
||||
| Q1 | Per-PR test-run budget | **Inventor's call** (m deferred). Pick: **60–90 s gate, 3–4 min full.** | Gate tier = L0 + L1 + L2 + L5 happy-path + L4 critical. L6 E2E gates deploy, not merge. |
|
||||
| Q2 | CI infrastructure | **Gitea Actions, gate tier only.** | Slice 7 adds `.gitea/workflows/test.yml` running the gate tier; full suite stays on merge-to-main. |
|
||||
| Q3 | Test DB topology | **YouPC for devs + ephemeral docker for CI.** | Local dev unchanged. Slice 7 wires Postgres service container in Gitea Actions. |
|
||||
| Q4 | Coverage target | **Critical-path only, no % gate.** | §4's 10 flows + every state-mutating service method gets a test. Coverage % output is informational in Slice 8, never a merge gate. |
|
||||
| Q5 | Production-grade floor | **Slices 1 + 4 + 5 before new feature work.** | These three land before any new paliad feature gets a coder shift. Slices 2, 3, 6 widen the floor on their own cadence. Slices 7-8 are nice-to-haves. |
|
||||
| Q6 | Slice ownership | **Head decides + rotate per profile.** | Backend slices (1, 2, 5) → backend-heavy coder. Frontend slices (3, 6) → frontend-heavy coder. E2E (4) → cross-stack. Head picks at dispatch time. |
|
||||
|
||||
**Implementer brief (post-m-decisions):**
|
||||
|
||||
1. **Slice 1 starts first** — migration dry-run harness + `make verify-migrations` + boot-smoke variant of `cmd/server/main_paliadin_backend_test.go`. Backend-heavy coder.
|
||||
2. **Slice 4 + Slice 5 in parallel** once Slice 1 is merged — Playwright golden-path (cross-stack coder, 5 specs) and handler integration (backend coder, auth/projects/deadlines/appointments/paliadin).
|
||||
3. Slice 7 (Gitea Actions wiring) follows once Slice 1 gate tier is proven locally.
|
||||
4. Slices 2, 3, 6 enter rotation alongside feature work — not blocking.
|
||||
5. Slice 8 (coverage reporting) lowest priority.
|
||||
|
||||
**Status:** DESIGN APPROVED — awaiting head's dispatch of Slice 1 coder shift.
|
||||
|
||||
Reference in New Issue